Description of principal options:

Building of a four-story building covering more than 5.600m². Apart from the offices, the complex will include a modular infrastructure, which can host various meetings and events, an auditorium of 100 seats, a multi-media room and kitchens.

Stability part:

This stone bloc rests on 2 rows of pillars and ends in an impressing overhang. The entrance is located at the floating end and groups all the events functions.

The structure of the building consists of concrete. The infrastructures, the central cores and the central bloc resting on pillars with an 8-meter overhang are made of on-site cast concrete. The superstructure of the building on the other hand, will be built with prefab prestressed concrete. Certain hollow spaces will be filled with silico-chalk elements.

The whole lot will rest on 160 posts. On site, 1.000 m³ of concrete will be cast and 2.000 m³ of prefab concrete elements, of which 1.500m³ flooring, will be installed. The levels are very open and free, because the structural grid measures 8 by 8 meter on 3 rows of pillars.

 

Special Techniques part:

For Electricity:

-       HT installation

-       Low-tension boards and subdivision boards

-       Columns and distribution circuits

-       Small equipment

-       Lighting equipment

-       Telephone and data network

-       Intrusion safety

-       Access control

-       CCTV

For HVAC

-       Heating and boiler equipment

-       Ice water production

-       Hot and ice water distribution piping

-       Water taps

-       Circulation pumps

-       Radiators

-       Cold beams

-       Ventilation groups

-       Ventilation network

-       Air vents

-       Automatic regulation

-       Central Technical Management

-       Electrical equipment

-       Insulation

Details: 
  • Construction site : Site of Tournai Expo, Kain
  • Contracting authority: Asbl Confédération Construction Hainaut Occidental
  • Architecture: Architecture aménagement sprl – Boudaillez & Michez
  • Stability and Special Techniques: ADEM Engineering Co
  • Contractor: AM Interconstruct / Eddy Devos Construction
  • Year: 2007-2008