Quantity determination of additives

Installation designed for the loading by tool loaders of required additives for the manufacturing of cement. The additives are placed in funnels by the tool loaders according to the needs. This installation required a 50 m long support at a height of more than 7 m, alongside an existing installation, in front of which the 80 ton tool loaders operate.

This project also required the building of a 1,700 m2 manoeuvre area for the tool loaders.

Details: 
  • Contracting authority: HOLCIM France SA
  • Construction site: Lumbres factory (FR)
  • Contractor: Eiffage (Perfonor)
  • Year: 2005