This project involves the building of new roads (5.300 m2), the repairs/replacement of the sewer system of the construction site and the building of a retention basin for a liquid fuel unloading installation on the old ovens 7 and 8 site.
The works could in any case hamper the operations of the factory.
Details:
- Contracting authority: HOLCIM Belgique SA
- Construction site: Obourg factory
- Year: 2007